Diagram 1 - Mediterranean Resources Comments On Hydroelectric Development In Its Region In Turkey

 

Diagram 2 - Mediterranean Resources Comments On Hydroelectric Development In Its Region In Turkey

 

Çorak

The targets at Çorak are primarily areas of the existing deposit where inadequate drilling was done in the past. The campaign on this deposit will consist of four 200-metre holes and one 150-metre hole. The map for these proposed holes (marked in green)  is shown below..

Surface protection of high and low grade mineralized zones by SRK

Click on map to enlarge

 

Taç

The target for a three/four-hole campaign at Taç is the part of the deposit (shown in crimson below) that was identified by SRK as potentially high-grade and yet was not included within the resource estimate due to drill spacings being too wide.

Taç Solid Model Looking Northeast

Click on map to enlarge